There are three methods to note a crew change in the schedule:
- An employee can be moved to a vacant shift on the schedule
- The employee can be scheduled in Shift details
- The Scheduling Tool / Schedule Replacement Finder can be used to fill a vacancy.
Each move or rescheduling method will create a vacancy in the employee’s originally assigned/scheduled job. These vacancies can be filled by following one of the three methods above for each affected position.
Comments
0 comments
Article is closed for comments.